9-story Office Building - New Bridge Street - Ludgate - London/UK



100, New Bridge Street, Ludgate / London
Spring elements on column heads
Spring elements on column heads
Building of a core on spring elements
Spring elements tunnel and Building
Vibration source (train)
100, New Bridge Street, Ludgate / London
Project
100 New Bridge Street
Ludgate / London
Design load
215.000 kN
   
Building
9-story office building with atrium and shopping area, partly founded on railway tunnel
Arrangement of spring elements
Basement and top of the tunnel
   
Structure
Concrete basement, 2 concrete core steel frames, floors of in-situ light weight concrete on metal decking
Vibration Control effect
85-90%
   
Noise and vibration source
Railway running through the building
Completion
1992
   
Base isolation system
Fully-prestressable GERB spring elements, Type GP + GPV
Vertical system natural frequency 3,7 Hz
Client
Rosehaugh Stanhope Developments (Holborn Viaduct) plc