Project
Charlotte Convention Center / Charlotte Trolley Project

A section of the Charlotte Trolley runs through the Charlotte Convention Center in close proximity to conference Areas and venues. High levels of struture borne noise from the train operations were expected if proper mitigation was not provided.
A floating track bed system was designed as an efficient system for reducing vibrations and noise in the conference center.

Design axle load
12,5 t

Mass-Spring-System
Length: 221 m
vertical system natural frequency: 6.5 Hz
Trough length: 26 m
Trackbed width: 8.5 m
Number of tracks: 2
Design velocity: 25 km/h
Trackbed mass: 1.4 t/m2

Construction Details
Floating twin-track slabs on jack-up system

Vibration Isolation System
456 spring elements, type GSIV

Commissioning July 2004

Owner
City of Charlotte

Vibration Consultant
Wyle Laboratories, Inc. (Arlington, VA)